Hello,
On the Brosum map for console. I currently have two contracts. That requires taking silage bales to Biogas Plant 250kW. The Biogas Plant won't accept the silage bales. Has anyone encountered this issue? I enjoy playing on this map. Just wondering if I was doing something incorrectly.
Sincerely,
CEH
Brosum Biogasplant
3 posts
Page 1 of 1
Re: Brosum Biogasplant
You might need to buy the biogas plant first to enable all the triggers.
This is also true for other maps.
This is also true for other maps.
Playing on PC - Win10
Ryzen 3600
RX 5500XT
16GB Ram
How to post log file
How to upload pictures
Please report bugs for FS22 using the bugtracker
Ryzen 3600
RX 5500XT
16GB Ram
How to post log file
How to upload pictures
Please report bugs for FS22 using the bugtracker
Re: Brosum Biogasplant
Thank you for the reply and info Eische, that worked